Soda
Hilton Double Tree
PROJECTS FACTS CREDITS
 Resort Hotel
Owner | Operator : Ngan Anh Trading and Tourism Joint Stock Company
Location : Hai Phong, Vietnam
Date : 2017
Concept : HILTON DOUBLETREE COASTAL CITY
Following are our FIRST DRAFT studies of the Hilton Doubletree site, Coastal City.
 
ANALYSIS (Observations):
Golf course a major asset for landscape, activities, etc.
Emphasis on Golf as greatest asset - for function, views, adjacency
Beach front not ideal  Negative views to west Void of significant Local culture.
Optimal views are to the west overlooking the golf course and south to mountains and temple. (West views compromised)
Site access issues and connectivity to Entertainment and commercial sites necessary; particularly the golf course.
Consider some modifications to land allocation placement.
 
MASTERPLAN OBJECTIVES:
Create a Resort entrance and environment - (for the Golfing community + Family)
Optimize views and natural ventilation (Avoid the bad views to the west)
Optimize the commercial use of space with adjacent sites (Entertainment park + Commercial Complex)
Optimize adjacency to the lake - and lake use (Aqua concept)
Optimize water edge - functionally and visually. Alter the lake edge / shape - by displacement.
Optimize the site access from three directions.
Optimize the masterplan circulation - between building uses, access, automobile, services loading, buses, Buggies and pedestri ans.
Hanoi  City Lake reference -bridge and temple island Create Islands
Optimize the INTERNAL views within the site (as views outward are limited - not beachfront (brown water)
Maintain the basic land allocation and Zoning - with suggested alterations.
 
HOTEL: OBJECTIVES:
Create a resort environment with public areas adjacent / connected to the lake
Optimize the Hotel Planning - with centralized Kitchen and services
Optimize the Hotel Room shape to offer best views
Material Reference to local culture
Maintain low rise, resort massing. Maximum 6 floors in height.
 
MASTER PLAN | HOTEL OPTION 1
Orthogonal / Garden structure scheme - 
Hotel separated into multiple distinct blocks - resort style
Optimizes the entrance, arrival sequence and maintains entrance from main road
Optimized layout for Kitchen and adjacencies to Food and Beverage
 
MASTER PLAN | HOTEL OPTION 2
Curved scheme / Terracing scheme
Optimizes land and lake area and this feature.
Section of hotel offers more terrace areas
 
MASTER PLAN | HOTEL OPTION 3
Bridge Scheme - Extending the hotel into the lake.
Dynamic, dramatic and most ambitious of the options.